|
TechShield Coating Solutions
|
Lisbon
|
ISO 13485, IATF 16949, RoHS
|
PCBA low pressure encapsulation, design support, testing
|
Medical, automotive, industrial
|
7–10 days (standard), 3 days (rush)
|
|
PortoCoat Advanced Technologies
|
Porto
|
ISO 9001, RoHS, IATF 16949 (pending)
|
Low pressure coating, conformal coating, prototyping
|
Aerospace, consumer electronics, IoT
|
48 hours (prototypes), 5–7 days (production)
|
|
Braga Electronics Protection
|
Braga
|
ISO 13485, ISO 9001, RoHS
|
Low pressure coating, mold design, EMI shielding
|
Medical implants, hearing aids, industrial control
|
5–10 days (50–5,000 units)
|
|
Algarve Tech Coatings
|
Faro
|
ISO 9001, DNV GL (marine), RoHS
|
Marine-grade low pressure coating, salt spray testing
|
Marine, coastal renewable energy
|
5–7 days (standard), 3 days (rush)
|
|
Viseu Precision Coatings
|
Viseu
|
ISO 9001, IPC-A-610 Class 3, RoHS
|
Microelectronics coating, X-ray inspection
|
Wearables, aerospace avionics
|
7–12 days (due to precision requirements)
|
|
Coimbra Electronics Solutions
|
Coimbra
|
IATF 16949, UL 60950, RoHS
|
Turnkey manufacturing (coating + assembly + testing)
|
Automotive, industrial automation
|
10–15 days (full turnkey), 5–7 days (coating only)
|
|
Leiria Coating Innovations
|
Leiria
|
ISO 9001, ISO 13485, RoHS
|
Custom material development, low pressure coating
|
Robotics, power tools, medical wearables
|
8–12 days (includes R&D for custom projects)
|
|
Aveiro Polymer Coatings
|
Aveiro
|
ISO 14001, EU Ecolabel, RoHS
|
Eco-friendly low pressure coating, sustainability consulting
|
Eco-conscious electronics, renewable energy
|
7–10 days (standard)
|
|
Setúbal Tech Protection
|
Setúbal
|
ISO 9001, RoHS, Civil Protection certified
|
Rush coating services, repair/rework
|
Healthcare, utilities, emergency equipment
|
48 hours (rush), 5 days (standard)
|
|
Viana do Castelo Coating Experts
|
Viana do Castelo
|
ISO 13485, Space Agency certified, RoHS
|
Prototyping, small-batch coating, custom mold design
|
Space, medical research, art-tech
|
5–7 days (prototypes), 10–14 days (custom molds)
|